You use this program to copy operations and/or components from another estimate or a stocked item.
Field | Description | ||||
---|---|---|---|---|---|
Copy |
Select this to begin the copy according to the selections you have made.
When you copy materials and/or operations from another estimate, then the custom forms defined against the source estimate's material and/or operations are copied to the new estimate. When you copy materials and/or operations from a stocked item, and the fields on the BOM operation and/or BOM structure custom form match the fields on the estimate operation and/or estimate structure custom form, then the custom form data defined against the source BOM's material and/or operations are copied to the new estimate. |
||||
Close | Select this to return to the previous screen. |
Field | Description | ||||||||
---|---|---|---|---|---|---|---|---|---|
Copy from | |||||||||
Source | Indicate where the operations and/or components must be
copied from.
|
||||||||
Stock code |
If the source is an Estimate, then you enter the non-stocked code in this field. If the source is a Stocked item, then you enter the stocked item code in this field. |
||||||||
Description | This indicates the description of the stock code/non-stocked code you entered. | ||||||||
Estimate route | If you are copying from another estimate or a stocked item, then the default route is displayed, but can be changed. | ||||||||
BOM route | Indicate the Bill of materials route from which to copy materials and operations when copying from a stocked item. Only operations and materials attached to the parent, or to any sub-assembly, on the selected route are copied. | ||||||||
Options | |||||||||
Copy operations | Select this to copy only the operations from another estimate/stocked item. | ||||||||
Copy materials | Select this to copy only the materials from another estimate/stocked item. | ||||||||
Copy method |
|
||||||||
Operations |
This only applies if you selected to Copy operations.
|
||||||||
Run time multiplier |
Indicate a multiplier to apply to the unit run time of all operations copied. If the Copy method is set to Auto, then the multiplier is applied automatically. If the Copy method is set to Review, then the multiplier is used as the default, but can be changed as each operation is copied. This option does not apply when copying subcontract operations. |
||||||||
Materials |
This only applies if you selected to Copy materials.
|
||||||||
Quantity per multiplier |
Enter a multiplier to apply to all materials copied. If the Copy options field is set to Auto, then the multiplier is applied automatically. If the Copy options field is set to Review, then the multiplier is used as the default but can be changed as each material component is copied.
|
If you are copying operations and you selected the Copy method -Review option, then this screen is displayed when you select the Copy option.
You use this screen to indicate the operations to copy.
Field | Description |
---|---|
Copy Operation | Select this to copy the current operation to the estimate. |
Ignore Operation | Select this to ignore the current operation and not copy it to the estimate. |
Abandon Copy |
Select this to stop the copy process and return to the previous screen. The operations you selected to copy are displayed and copied. |
Operation number | This indicates the operation to copy. |
Work center | This indicates the work center for the operation. |
Description | This indicates the work center description for operations and the stock code description for stocked and non stocked items for materials. |
Unit run time | This indicates the unit run time defined against the operation. |
Run time multiplier | Enter the amount by which the Unit run time must be multiplied for the new estimate. |
Hierarchy |
Indicate the hierarchy to which the operation must be assigned. You can use the P&C Maintenance of Job Hierarchies program to maintain hierarchies. This is only enabled if you selected the option: Maintain hierarchies (Estimates), and the quotation is a hierarchical quotation (Quotations). |
If you are copying materials and you selected the Copy method -Review option, then this screen is displayed after you completed the selection of operations to copy.
You use this screen to indicate the materials to copy to the estimate.
Field | Description | ||||
---|---|---|---|---|---|
Copy Material | Select this to copy the current material to the estimate. | ||||
Ignore Material | Select this to ignore the current material and not copy it to the estimate. | ||||
Abandon Copy |
Select this to stop the copy process and return to the previous screen. |
||||
Sequence number | This indicates the sequence number for the stock item in the bill of materials. | ||||
Stocked code | This indicates the material stock code and description of the stock item to copy. | ||||
Description | This indicates the description for the stock code. | ||||
Quantity per | This indicates the quantity of the stock code. | ||||
Quantity per multiplier |
Enter the amount by which the Quantity per must be multiplied for the quantity for the new estimate.
|
||||
Hierarchy |
Indicate the hierarchy to which the allocation must be assigned. You can use the P&C Maintenance of Job Hierarchies program to maintain hierarchies. This is only enabled if you selected the option: Maintain hierarchies (Estimates) and the quotation is a hierarchical quotation (Quotations). |
Electronic Signatures provide security access, transaction logging and event triggering. This enables you to increase control over your system changes.
Access to the following eSignature transactions within this program can be restricted at Operator, Group, Role or Company level. You configure this using the eSignature Setup program.
eSignature Transaction | Description |
---|---|
QOT Estimate add component |
Controls access to the Add Component function in the following programs:
|
QOT Estimate change component |
Controls access to the Change function for Components in the following programs:
|
QOT Estimate delete component |
Controls access to the Delete function for Components in the following programs:
|
QOT Estimate add operation |
Controls access to the Add Operation function in the following programs:
|
QOT Estimate delete operation |
Controls access to the Delete function for Operations in the following programs:
|