You use this program to produce a report indicating all the elements attached to each level of a structure.
Summaries are listed at the end of the report detailing the total usage of all the elements throughout the structure chain and the totals throughout the structure chain by incidence code.
Field | Description | ||||||||
---|---|---|---|---|---|---|---|---|---|
Report type | This option enables you to indicate the type of report
you want to generate (see Report Details).
|
||||||||
MPS items | This option enables you to indicate whether you want to
include Master Production Schedule items in the
report.
|
||||||||
Print options | |||||||||
Print manufacturing u/m quantities | Select this to print the quantities on the report in the manufacturing unit of measure. This applies when using Manufacturing unit of measure (Work in Progress Setup). Quantities are printed in the manufacturing unit of measure when a Manufacturing unit of measure is defined against the stock code (Stock Codes) and the Manufacturing unit of measure is used in the Bills of Materials.Quantities are printed in the stocking unit of measure when this option is not enabled. |
Field | Description |
---|---|
Stock code selection |
Indicate a selective range of stock codes according to which you want to generate the report.
|
These options enable you to apply a theme to the report and to define multiple output destinations for the report once it has been compiled (SRS Output Options).
The following information is included in the detailed report:
The following information is included in the summary report:
You cannot access this program when the Activity based costing required option is set to No ( Bill of Materials Setup).