You use this program to produce a list of quotations according to a range of selection criteria.
Field | Description |
---|---|
New page per quotation | Select this to print each individual quotation on a separate page. |
Include line types |
Select the line types you want to include on the quotations. All line types are included by default but you can deselect those you do not require. The following line types are available for inclusion on quotations:
|
Field | Description |
---|---|
Quotation selection | Indicate the quotation(s) for which to generate the report. |
Status selection | Indicate the status(es) for which to include quotations in the report. |
Customer selection | Indicate the quotations to include in the report based on the customer for whom the quotation was prepared. |
Job classification selection | Select quotations for printing based on the user-defined classification assigned when the quote was captured. |
This tab page contains additional options according to which you can select the quotations to include in the report.
Field | Description | ||||
---|---|---|---|---|---|
Offers to print | Indicate whether to include details of offers on the report. | ||||
Date type | |||||
None | Select this to include all quotations irrespective of their expiry or tender dates. | ||||
Tender | Select this to print quotations for a selection of tender dates. | ||||
Expiry | Select this to print quotations for a selection of expiry dates. | ||||
Estimate details | |||||
List estimate details |
Select this to print the estimate details on the quotations. If you do not select this option, then you cannot select any additional options pertaining to estimate details. |
||||
Route | Select the route for which you want to print the estimate details. | ||||
Materials and Operations | Select this to include details for materials and operations on the report. | ||||
Materials only | Select this to include details of materials only on the report. | ||||
Operations only | Select this to include details of operations only on the report. | ||||
Sequence materials by operation | Select this to list each operation together with the
list of components for that operation. If you do not select this option, then operations are listed first, followed by the list of components. |
||||
Cost selection | Indicate which costs must be printed for the materials and operations selected. | ||||
List costs | Select this to print the extended unit costs. | ||||
List escalated costs | Select this to print the extended costs including mark-ups and/or margins. | ||||
Date selection |
Indicate the date(s) for which to include quotations on the report.
|
These options enable you to apply a theme to the report and to define multiple output destinations for the report once it has been compiled (SRS Output Options).